

Construction Done Right



King-Witzel Construction
The Hardwood Flooring Pros


How does it work for floor buffing job?
We simply clean and buff minor surface scratches out of the top layer of the finish then apply a new topcoat of finish, leaving your floor looking like new.
How does it work for floor sanding job?
We simply sand minor and major surface scratches out of the finish then apply a new topcoat of finish, leaving your floor looking like new.
How much does it cost?
Prices vary by the stage your floor needs.
Stage 4 is $3.50-includes three different levels of sanding and the best option when getting your floors refinished this will get up major and minor floor scratches.
Stage 3 is $3.00 this is usually for minor floor damage. It for old flooring that needs a little new polish.
Stage 2 is $2.50 and it is for newer floor that have mininal damage (light scratches) and need a new shine.
Stage 1 is $1.50 for new floor that need a deep condition with a buff out. You should get this done once a year to preserve your floors
How long does it take?
Most buffing and express sanding jobs take 1 day. Sanding jobs usually take 2-3 days.
How do you get it to be dustless?
We are not sanding, we are only buffing.
Even when we do sand our sanders have a vacumm system that allow us to have mininal dust.
How long does it take to dry?
Our product typically dries in about 30 mins and fully cures in 3 to 7 days for buff out. And our polyurethane dries in about 8 hrs and fully cures in 3 to 7 days.
Do I have to be out of my home while this is being done?
No. We can do the service while you are at home. Our finish is odor free, and quick drying. We mostly used water based unless the customer otherwise.
What types of finishes are there?
We offer gloss, semi-gloss and satin finishes.
Do you move furniture?
Yes, for a slight fee.
Does it smell?
Our buffing finish is odor free. And our sanding finish has a light odor to it.
*These prices are subject to change based on contractor's review and or if floor needs more work other than basic sanding; supplies are not included and are priced based on the size of the job*
FAQ
